<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Tegbe clarifies: No 3-month promise on power grid - MegaIcon Magazine</title>
	<atom:link href="https://megaiconmagazine.com/tag/tegbe-clarifies-no-3-month-promise-on-power-grid/feed/" rel="self" type="application/rss+xml" />
	<link>https://megaiconmagazine.com</link>
	<description>Celebrating Human Excellence</description>
	<lastBuildDate>Fri, 08 May 2026 01:32:08 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://i0.wp.com/megaiconmagazine.com/wp-content/uploads/2020/12/megaicon_logonew.jpg?fit=32%2C9&#038;ssl=1</url>
	<title>Tegbe clarifies: No 3-month promise on power grid - MegaIcon Magazine</title>
	<link>https://megaiconmagazine.com</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">76701738</site>	<item>
		<title>Tegbe clarifies: No 3-month promise on power grid, outlines realistic reform timeline</title>
		<link>https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline&#038;utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline</link>
					<comments>https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/#respond</comments>
		
		<dc:creator><![CDATA[Mega Icon]]></dc:creator>
		<pubDate>Fri, 08 May 2026 01:32:08 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Top Stories]]></category>
		<category><![CDATA[Joseph Olasunkami Tegbe]]></category>
		<category><![CDATA[outlines realistic reform timeline]]></category>
		<category><![CDATA[Tegbe clarifies: No 3-month promise on power grid]]></category>
		<guid isPermaLink="false">https://megaiconmagazine.com/?p=45207</guid>

					<description><![CDATA[<p>The Minister-designate for Power, Joseph Olasunkanmi Tegbe, has firmly clarified that he never promised to fix Nigeria’s national electricity grid within three months, describing such claims circulating in sections of the media as a misrepresentation of his Senate screening remarks. A statement issued  after his appearance before the Senate stressed that Tegbe was deliberate and [&#8230;]</p>
<p>The post <a href="https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/">Tegbe clarifies: No 3-month promise on power grid, outlines realistic reform timeline</a> first appeared on <a href="https://megaiconmagazine.com">MegaIcon Magazine</a>.</p>
<p>The post <a rel="nofollow" href="https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/">Tegbe clarifies: No 3-month promise on power grid, outlines realistic reform timeline</a> appeared first on <a rel="nofollow" href="https://megaiconmagazine.com">MegaIcon Magazine</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em><strong><span style="font-size: 36pt; color: #ff0000;">T</span>he Minister-designate for Power, Joseph Olasunkanmi Tegbe, has firmly clarified that he never promised to fix Nigeria’s national electricity grid within three months, describing such claims circulating in sections of the media as a misrepresentation of his Senate screening remarks.</strong></em></p>
<p>A statement issued  after his appearance before the Senate stressed that Tegbe was deliberate and cautious in his presentation, avoiding unrealistic timelines while outlining a structured reform pathway for the power sector.</p>
<p>According to the clarification, Tegbe explained that while Nigerians can expect early signs of progress, particularly in grid stabilisation within his first 100 days in office, comprehensive reforms will be guided strictly by technical assessments, stakeholder consultations, and sector realities.</p>
<p>He noted that critical challenges such as gas supply constraints, metering gaps, infrastructure decay, and commercial inefficiencies require coordinated interventions that cannot be resolved through arbitrary timelines.</p>
<p>“My commitment to this distinguished chamber and to Nigerians is clear: we will deliver visible and measurable improvement in the power sector,” Tegbe stated during the screening.<br />
He assured that his focus would include stabilising the national grid, modernising transmission and distribution infrastructure, strengthening commercial frameworks, and enforcing accountability across the electricity value chain.</p>
<p>On tariff policy, the minister-designate reaffirmed that reforms would be carefully designed to balance sustainability with social protection, ensuring that vulnerable households are shielded while also restoring investor confidence in the sector.</p>
<p>The statement further emphasised that Tegbe’s approach reflects discipline, technical understanding, and a reform-minded agenda aimed at delivering lasting solutions rather than short-term political promises.</p>
<p>It added that he remains open to responsible media engagement and constructive clarification where necessary, noting that accurate reporting is essential to public understanding of ongoing efforts to reposition Nigeria’s power sector.</p>
<p>Tegbe reaffirmed his readiness to lead a transparent, results-driven reform process anchored on accountability, realism, and measurable progress.</p>
<p><a class="a2a_button_facebook" href="https://www.addtoany.com/add_to/facebook?linkurl=https%3A%2F%2Fmegaiconmagazine.com%2Ftegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline%2F&amp;linkname=Tegbe%20clarifies%3A%20No%203-month%20promise%20on%20power%20grid%2C%20outlines%20realistic%20reform%20timeline" title="Facebook" rel="nofollow noopener" target="_blank"></a><a class="a2a_button_twitter" href="https://www.addtoany.com/add_to/twitter?linkurl=https%3A%2F%2Fmegaiconmagazine.com%2Ftegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline%2F&amp;linkname=Tegbe%20clarifies%3A%20No%203-month%20promise%20on%20power%20grid%2C%20outlines%20realistic%20reform%20timeline" title="Twitter" rel="nofollow noopener" target="_blank"></a><a class="a2a_button_whatsapp" href="https://www.addtoany.com/add_to/whatsapp?linkurl=https%3A%2F%2Fmegaiconmagazine.com%2Ftegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline%2F&amp;linkname=Tegbe%20clarifies%3A%20No%203-month%20promise%20on%20power%20grid%2C%20outlines%20realistic%20reform%20timeline" title="WhatsApp" rel="nofollow noopener" target="_blank"></a><a class="a2a_button_email" href="https://www.addtoany.com/add_to/email?linkurl=https%3A%2F%2Fmegaiconmagazine.com%2Ftegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline%2F&amp;linkname=Tegbe%20clarifies%3A%20No%203-month%20promise%20on%20power%20grid%2C%20outlines%20realistic%20reform%20timeline" title="Email" rel="nofollow noopener" target="_blank"></a><a class="a2a_dd addtoany_share_save addtoany_share" href="https://www.addtoany.com/share#url=https%3A%2F%2Fmegaiconmagazine.com%2Ftegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline%2F&#038;title=Tegbe%20clarifies%3A%20No%203-month%20promise%20on%20power%20grid%2C%20outlines%20realistic%20reform%20timeline" data-a2a-url="https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/" data-a2a-title="Tegbe clarifies: No 3-month promise on power grid, outlines realistic reform timeline"></a></p><p>The post <a href="https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/">Tegbe clarifies: No 3-month promise on power grid, outlines realistic reform timeline</a> first appeared on <a href="https://megaiconmagazine.com">MegaIcon Magazine</a>.</p><p>The post <a rel="nofollow" href="https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/">Tegbe clarifies: No 3-month promise on power grid, outlines realistic reform timeline</a> appeared first on <a rel="nofollow" href="https://megaiconmagazine.com">MegaIcon Magazine</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://megaiconmagazine.com/tegbe-clarifies-no-3-month-promise-on-power-grid-outlines-realistic-reform-timeline/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">45207</post-id>	</item>
	</channel>
</rss>
